MS-Chart using ADO to get data
Exaple of using MS-Chart control and ADO database. Load data (by projet id, by dates) into 2 dim array and graph it. Ability to Save/Print/Copy graph .
AI
ملخص الذكاء الاصطناعي: This codebase represents a historical implementation of the logic described in the metadata. Our preservation engine analyzes the structure to provide context for modern developers.
كود المصدر
Upload
التعليقات الأصلية (3)
مسترجع من Wayback Machine